Chapter 1 General Daily Maintenance Guidelines
Chapter 2 Standard Periodic Maintenance Regulations
2.1 Daily Inspection and Lubrication
2.2 Inspection and Replacement of Cylindrical Pins and Circlips
2.3 Fastener Inspection and Tightening
2.4 Emergency Disposal of Operational Abnormalities
2.5 Maintenance Qualification Requirements
2.6 Maintenance of Lubrication System Oil Pump Filter
-
New machine trial period (first two months): Clean once a week
-
Stable production period: Clean once every two weeks
2.7 Lubricant Replacement Cycle
-
First oil replacement for new equipment: Replace lubricant after 30 consecutive working days
-
Subsequent routine replacement: Every 6 to 12 months, determined by oil cleanliness and actual operating load

English
عربى
中文简体






